Matribhumi Hydropower Development Company Pvt. Ltd.
Civil and Hydro-Mechanical Works of Sisuwa Khola Hydroelectric Project, 13.5 MW (Proposed 16.5 MW)
Package 1: Hydromechanical Construction, SKHEP-2026-HM/01
Package 2: Civil Construction
Package A: SKHEP-2026-CW/02(A)
Headworks, Headrace Tunnel & Collection Headworks
Package B: SKHEP-2026-CW/02(B)
Penstock Alignment, Powerhouse, Tailrace, Switchyard & Protection Works
© 2026 Suchanaa. All Rights Reserved.