| NEA-THPS-2082/083-CST-01 | Right Bank and Left Bank Protection Works at Headworks area of THPS | 1. Ruru Construction Pvt. Ltd., Kathmandu-25, Kathmandu 2. Sundaradevi Nirman Sewa, Bidur-10, Nuwakot 3. Tamang-Thokar Joint Venture, Myagang-2, Nuwakot 4. Gorakha-Paudel JV, Bidur-9, Nuwakot |
| NEA-THPS-2082/083-CST-02 | Clearance of flood deposits and maintenance of weir at headworks | 1. Sukhad-Lirung JV, Bidur Municipality-10, Nuwakot |
| NEA-THPS-2082/083-MST-02 | Fabrication, Supply and Delivery of Turbine Spare Parts for Unit 4-7 | 1. Machhapuchhre Metal and Machinery works Pvt. Ltd., Pokhara 2. Malhotra Enterprises, Kathmandu 3. Nepal Hydro & Electric Limited, Rupandehi |
| NEA-THPS/2082/083-MST-03 | Repair and Maintenance of Barrage (Main) Gate & other Miscellaneous Works at Headworks of Trishuli Hydropower Station | 1. Machhapuchhre Metal and Machinery works Pvt. Ltd., Pokhara 2. Sukhad-Lirung JV, Nuwakot (Lirung Nirman Sewa, & Sukhad Engineering Consultancy & Construction Pvt. Ltd) |