Mahakali Irrigation Project (Phase 3), Kanchanpur
| MIP/NCB-02/082-83 | Deep Tubewell Drilling, Construction of Pump House, Distribution System, Pump Installation and Electrification Works in different location of MIP-III Within Ch. 0+000 to Ch.48+262 of TMC | 1. Bhumi-Suryodaya J/V, Rolpa 2. Jayashree-Gaurishankar-GM J/V, Bhaktapur 3. Sushil-Prem J/V, Kailali 4. Uchchakoti Nirman Sewa, Kailali 5. Ultra-Doleshwor J/V, Kathmandu |
© 2026 Suchanaa. All Rights Reserved.