Nepal Electricity Authority
| KGA-2082/83-MT-02 | Repair and Hard Coating of Francis Runner and Wicket Gates of Kaligandaki ‘A’ Hydropower Station, Beltari, Syangja | M/S National Tech Hydro and Electric Pvt. Ltd., Devdaha, Rupandehi | NRs. 2,80,25,808.00 (With VAT) |
| NEA-DGD/2082/083-03 | Drainage System Upgradation and Yard Construction Works at 13 KV Duhabi S/S, Duhabi, Sunsari | M/S Rajan Construction. Budhiganga-4, Morang | NRs. 92,29,295.19 (With VAT) |
| CW-ST-2082/83-28(Re) | Repair and Maintenance of Distribution Transformers | M/S Allied Power Engineering. Hetauda-8, Nepal | NRs. 5,86,96,381.00 (With VAT) |
| NEA/BDC/2082-083-04 | LT Line Extensuin Work | M/S Adarsh Nepal Construction & Consultant, Kathmandu | NRs. 3,15,015.75 (With VAT) |
| NEA-KNPDC-2082/83-SQ-05 | Boundary Wall Construction works At Bhardha Substation, Saptari | M/S Gayatri Nirman Sewa, Kanchanpur, Saptari | NRs. 9,77,846.40 (With VAT) |
| NEA-PDC-2082/083-08SQ(RE) | Concreting of the pathway between Transformer workshop and Pokhara DCS Gate | M/S Saraswoti Nirman Sewa, Pokhara | NRs. 3,60,323.10 (With VAT) |
© 2026 Suchanaa. All Rights Reserved.